Case Study: Alpha | Mobil DTE Oil Purification

Case Study: Alpha | Mobil DTE Oil Purification

THE SITUATION: The injection moulding machines at ALPLA were experiencing higher than normal levels of contamination in their oil. The manufacturer of their injection moulding machines requires a cleanliness of ISO 16/14/11; anything less will void the warranty....
Case Study: General Electric | Wind Turbine Gearbox

Case Study: General Electric | Wind Turbine Gearbox

THE SITUATION: GE Energy’s Wind Turbines were experiencing premature gearbox and bearing wear resulting in extensive repairs, rebuilds, and shortened oil and machine life. Triple R’s solution to frequent oil changes and expensive repairs is perfectly clean oil. The...

Pin It on Pinterest